ETSU ALERT ARCHIVE PAGE

  Sidewalk Work
|Modified: 7/20/2007|Active: NO|

Work will begin on the sidewalks between the Carillon and Gilbreath Drive starting on June 4 and continuing through July 9.  The sidewalks will be demolished and new walks installed.  Therefore, alternate travel routes should be taken.  Also, 4 parking spaces adjacent to the sidewalks along Gilbreath Drive will be barricaded during the construction.  Please contact Facilities at 97900 if you have any questions.