ETSU Advisories Advisories and important information for employees and students related to ETSU http://www.etsu.edu/rss/ en-us Copyright 2011, East Tennessee State University DP Culp Landscape Project http://etsupws.etsu.edu/advisory/advisory/details/1433 http://etsupws.etsu.edu/advisory/advisory/details/1433 7/30/2014 2:07:19 PM There is a planned exterior modification project at the NW corner of D.P. Culp by Nicks Hall. The project will result in sidewalk closure along with periodic disruption to traffic flow. The project is scheduled to start 7/31 and end 8/13. Please contact Facilities with any questions. UPDATE Brown Hall Auditorium - Building entrance improvements - begin June 30 and end August 22 http://etsupws.etsu.edu/advisory/advisory/details/1418 http://etsupws.etsu.edu/advisory/advisory/details/1418 5/20/2014 9:08:43 AM UPDATE TO BEGIN DATE The entry way into the Auditorium will be reworked, including a new stoop, steps, ramp, and door hardware. This will interrupt access to the Auditorium for two different periods while different aspects of the work are being completed. The first phase of this work is scheduled to take place starting May 23 and ending June 9. The second phase has yet to be scheduled, but will be completed before the Fall Semester begins. Burleson and Mathes - Building entrance improvements - begin June 23 and end August 25 http://etsupws.etsu.edu/advisory/advisory/details/1417 http://etsupws.etsu.edu/advisory/advisory/details/1417 5/19/2014 9:17:01 AM Various doors will have hardware replaced and steps will have their handrails replaced. Interruption to pedestrian traffic should be periodic and brief. Temporary handrails will be provided between the removal of the existing handrails and installation of new handrails. Sam Wilson - Building entrance improvements - begin May 12 and end August 25 http://etsupws.etsu.edu/advisory/advisory/details/1416 http://etsupws.etsu.edu/advisory/advisory/details/1416 5/19/2014 9:16:30 AM Most south and west side doors will either be completely replaced or be upgraded with new ADA-compliant hardware. This should not impede normal access by building users in a significant way. The single door at the west side that leads to an Electrical Room will receive a new concrete stoop. This will prevent this door from being used for a couple of days. Various steps will undergo handrail replacement. Interruption to pedestrian traffic should be periodic and brief. Temporary handrails will be provided between the removal of the existing handrails and installation of new handrails. A portion of sidewalk to the right of the main south entrance facing Lamb Hall will be replaced. Handicap access through this entrance will be unavailable while this work is taking place. It is scheduled to start May 19 and end May 28. Brooks Memorial Gym - Building entrance improvements - begin May 12 and end August 25 http://etsupws.etsu.edu/advisory/advisory/details/1415 http://etsupws.etsu.edu/advisory/advisory/details/1415 5/19/2014 9:15:36 AM All exterior doors except the new east Quad-facing doors will be replaced. This should not impede normal access by building users in a significant way. Concrete sidewalk and step areas along the south side of Brooks will undergo patch repairs and handrail replacement. Interruption to pedestrian traffic should be periodic and brief. Temporary handrails will be provided between the removal of the existing handrails and installation of new handrails. The single door at the southwest corner that opens into the steps that lead to the Basement level gym will receive a new concrete stoop. This will prevent this door from being used for a couple of days. Burgin-Dossett Hall - Building entrance improvements - begin July 7 and end August 4 http://etsupws.etsu.edu/advisory/advisory/details/1414 http://etsupws.etsu.edu/advisory/advisory/details/1414 5/19/2014 9:14:55 AM The south side exterior stair facing Rogers-Stout will undergo handrail replacement, partial step replacement, and walkway coating. This work will be phased in order to maintain limited access and egress through this building entrance. Warf-Pickel - OLDER - Elevator - NOT Operational from 06/27 to 08/15/2014 http://etsupws.etsu.edu/advisory/advisory/details/1407 http://etsupws.etsu.edu/advisory/advisory/details/1407 4/25/2014 8:10:55 AM The Warf Pickel OLDER elevator will NOT be operational from June 27 to August 15 due to repairs/replacement. Please check back for future updates. Burgin Dossett - SOUTH - Elevator - NOT Operational from 06/27 to 08/15/2014 http://etsupws.etsu.edu/advisory/advisory/details/1406 http://etsupws.etsu.edu/advisory/advisory/details/1406 4/25/2014 8:09:59 AM The Burgin Dossett SOUTH elevator will NOT be operational from June 27 to August 15 due to repairs/replacement. Please check back for future updates. Dome Locker Room Project http://etsupws.etsu.edu/advisory/advisory/details/1401 http://etsupws.etsu.edu/advisory/advisory/details/1401 4/22/2014 1:21:46 PM The Dome locker room/weight room project will begin on 5/13/14 and should be completed by 8/15/14. The contractor will be working in the northeast arena area as well as the locker rooms on the east side of the Dome. If you have specific questions about this project, please contact Eddie Harkleroad or Bill Rasnick at 439-7900.