skip to main content columnskip to left navigation

ETSU Parking

East Tennessee State University

Campus Construction, Traffic & Parking Updates
~ Updated Maps Showing Lot Closures Can Be Found at the Bottom of this Page ~

 

August 16, 2018

Beginning Monday Aug. 20, all designated parking rules are in effect and will be enforced. Between the hours of 7:30 a.m. to 4:30 p.m., Monday through Friday, all faculty/staff and students must display a valid parking permit and park in the respective lots. This means that faculty/staff may only park in faculty/staff or undesignated spaces with their faculty/staff permits. Students may only park in student or undesignated spaces with their student permits.

All contractor vehicles must have a construction permit or company logo displayed on the vehicle. Vehicles displaying construction parking permits may park in designated construction zone parking areas.

As a reminder, Parking Services is ticketing for all other regulations which are being enforced 24 hours a day, 7 days a week. If you have questions, please contact us at or 423-439-5650.

August 13, 2018

Family Medicine's parking lot will be closed except to patients on Wednesday, August 15 and Thursday, August 16. This closure will be for necessary lot repairs.

August 10, 2018

Beginning next Monday, August 13, 2018, there will be road repairs and paving taking place directly in front of Ross Hall on S. Dossett Dr. The 4 faculty/staff parking spots will be used for traffic flow for the first 2 days and blocked off for paving on Wednesday and Thursday.

August 6, 2018

Please be advised that spaces in the south lane of South Dossett, the section between Jack Vest Drive and John Robert Bell Drive, have been converted to a no parking zone. Please watch for new signage when choosing a parking space.

August 6, 2018

Please be advised that due to the closure of Lot 35 three Clinic Reserved spaces have replaced three Faculty/Staff spaces in Lot 34. Please watch for new signage when choosing a parking space.

August 6, 2018

Due to the narrowness of Stout Drive, the three Archives/Museum spaces that were located directly in front of the Reece Museum have been moved to replace the three parallel Faculty/Staff spaces that are located adjacent to the original spaces. The three Archive/Museum spaces are going to be a no parking zone. Please watch for new signage when choosing a parking space.

July 19, 2018

As part of the "Solar Panel Project", there will be a series of "Crane Lifts" to the roof of Sherrod Library. In order to accommodate the large crane necessary for these lifts, we need to temporarily close the loading dock and adjacent parking spots behind Sherrod Library for the following dates and times:

Friday, 7/20/18 from 6-10 AM

Monday, 7/23/18 in the Evening

Tuesday, 7/24/18 from 6 AM to 7 PM

Friday, 7/27/18 for a Half Day

Below is a depiction of the affected area:

Sherrod Solar Panel Crane Summer 2018

July 17, 2018

Please be advised that with the closure of Lot 35, metered spaces were moved to Lot 34.

June 18, 2018

The expected closures of the south side of South Dossett Drive and lot 35 have been changed from today to tomorrow, June 19, 2018. These areas are expected to be closed until 2020. A picture for the intended closings is located in the entry for June 14, 2018.

In addition to these closures, part of lot 32 will be closed Tuesday, June 19, and Wednesday, June 20, for asphalt repair. Stout Drive will also have some closure for asphalt repair Tuesday, June 19, and Wednesday, June 20. Traffic will be re-routed through lot 32.

June 14, 2018

Due to the intended closure of the south side of South Dossett Drive, the direction of traffic flow on Ross Drive has been rerouted. Traffic flow now goes from north to south to provide access to South Dossett Drive. The closures of the south side of South Dossett Drive and of lot 35 are expected to be performed on Monday, June 18, 2018.

Lo 35 & SDE Closure (06-14-2018)

June 8, 2018

Part of the new Nell Dossett parking lot requires new storm drainage. Starting on Wednesday, June 13th, through Thursday, June 14th, there will be a lane restriction on Seehorn Drive by the Art Annex. The restriction will cause the north side (opposite of the Art Annex) to be narrowed by 5 feet. There should not be any interruption to emergency vehicles or normal traffic. Please be cautious.

Seehorn Partial Closure 6/13/18-6/14/18

May 31, 2018

For additional advisories, please visit https://webapps.etsu.edu/Advisory/

May 31, 2018

Please be advised that tree removals will be taking place in multiple areas on campus. Part of lot 11 has been blocked off for tree removals. On Monday, June 4th, all of the spaces on David Collins Way to the south of the Warf-Pickel play lots will be blocked off for at least two days for a tree removal.

May 29, 2018

Due to the intended closure of the south side of South Dossett Drive, the direction of traffic flow on Ross Drive is being rerouted. Seal coating and painting for this project will begin today if weather permits. Once complete, traffic flow will go from North to South to provide access to South Dossett Drive.

Ross Drive Directional Change

May 29, 2018

The contractor continues to work on demolition on South Dossett Drive in front of Lamb Hall. Under the asphalt road was a concrete road that will require additional demolition resources for placement of storm water pipe. We anticipate the work to be completed in a few weeks. This was a 90 day project with completion originally scheduled in mid-August, pending no weather delays. Please bear with us during this construction project that is to help alleviate flooding on roadways and across sidewalks. We are doing our best to expedite this portion for clinic access.

SDE Storm Water Construction

May 29, 2018

The contractor will be starting the demolition of the front stairs at Gilbreath Hall on Thursday 05/31/2018. Below is a diagram related to this construction.

Gilbreath Stairs Construction

May 23, 2018

The storm water contractor will be performing asphalt milling operations at John Robert Bell Drive by Wilson Wallis and the intersection of South Dossett Drive/John Robert Bell Drive. The milling is preparation for excavation for a new storm water drainage line. The work has already begun and will continue in this area with an expected completion date of August 15th.

Traffic flow will be restricted to one lane at times and a flagman will be present for traffic control.

May 22, 2018

Thursday night, May 24, 2018, lot 32 will be closed. The storm water contractor will be starting their excavation on Friday. Upon completion of the parking lot excavation, it will open and traffic will be routed through the parking lot as Stout Drive will be closed for a 2nd excavation relative to additional drains and pipe required to handle rain loads.

May 21, 2018

The following drawings illustrate the construction related closures/changes that will be in effect for the vicinity surrounding Burgin Dossett until around the end of August. This project involves removing the existing porticoes on the west and east sides of Burgin Dossett. The project is extensive and involves heavy construction equipment that will generate loud noise and vibration.

The 1st floor entrances on the west side will be closed for safety. The entrance and stairs to the basement by Procurement will remain open for egress. Fire egress is through the north and south entrances.

The meters in lot 31 are being temporarily used as ADA (disability) spaces to offset the loss of ADA spaces from lot 32.

 Burgin Dossett Construction (Summer 2018)

Burgin Dossett Construction (Summer 2018)

May 9, 2018

More information will be coming soon about how the Culp renovation will affect parking, but here is a link to some of the updates with information like where offices have been relocated: https://www.etsu.edu/culp/#tab-2-1.

April 9, 2018

Career Quest will be in the ETSU/MSHA Athletic Center (mini-dome) April 12-13. In order to provide safe access, the following detours will be in effect from noon to 5 p.m. on April 11 and then after the event on April 13.

  • Eastbound right-hand lane of State of Franklin, between Jack Vest Drive and the mini-dome side entrance, will be closed. This is the lane immediately parallel to the State of Franklin side of the parking garage and mini-dome.
  • East entrance to the parking garage, between the garage and the mini-dome, will be closed to all traffic.

February 9, 2018

The Johnson City Area Builders Association will be bringing their Annual Home and Garden Show to the ETSU campus February 19-19, 2018. The event is scheduled to take place in the ETSU/MSHA Athletic Center (Mini-Dome). We are anticipating that event exhibitors will be bringing a number of large vehicles containing display items and booths on campus during this time. In order to provide safe access for ETSU students, faculty, staff, and our visiting event exhibitors and to provide a relatively trouble-free traffic pattern during the event, the following detours will be in effect for periods of time beginning Wednesday, February 14, 2018 until Monday, February 19, 2018:

  • The Eastbound right-hand lane of State of Franklin, between Jack Vest Drive and the Mini-Dome side entrance, will be closed. This is the lane immediately parallel to the State of Franklin side of the parking garage and mini-dome.
  • The East Entrance to the parking garage, between the garage and the mini-dome, will be closed to all traffic.

In order to cut down on congestion in these areas and to possibly avoid traffic delays, it is recommended that alternate routes be utilized to enter and exit the parking garage and surrounding lots during these dates. Go Bucs Trail and J.L. Seehorn, Jr. Road can both be accessed from David Collins Way on the far west end of campus, beside Earth Fare. Go Bucs Trail provides a straight route to the garage and surrounding lots, while J. L. Seehorn, Jr. Road provides easy access to Jack Vest Drive, which also connects to the garage area.

We understand that this may be a short-term inconvenience for some. We certainly appreciate your understanding and cooperation as ETSU continues to promote involvement and partnerships with our surrounding communities.

October 12, 2017

The contractor performing storm water drainage work on campus will be returning tomorrow, Friday the 13th, to continue work on the items that they were not able to complete over the summer. They intend to work over the weekend and through Tuesday the 17th. There may be some disruption to traffic flow due to the work that will occur in lot 37 by Sam Wilson and Campus Center Building. The contractor will perform traffic management in areas affected. Barricades will be set to block off spaces tomorrow evening.

  • Traffic will still be able to flow behind Carter Hall.
  • There will be a need to close off the RA/RD reserved parking space behind Carter Hall during the work.
  • No parking on the west side of Campus Center Building.
  • Other locations involved in contractor work include the concrete walk/curb repair that may affect some parking in Lot 21's northwest corner.
  • Pavement marking on Jack Vest at round-a-bout.
  • Contractor is aware of Train Museum operations on Saturday.

September 1, 2017

We wanted to notify you of how parking will work Friday, September 1st, due to preparation for the football game that will be on Saturday, September 2nd. The half of South Dossett closest to the stadium will be closed and cleared by 5:00 p.m. so that only those with a tailgating permit may be parked in the affected area. Other areas affected will be Lots 17A, 21, 22, 38, 39 (Nancy Dishner Lane), U and T. These areas will be paid parking for the game.

Vehicles not moved from these areas by 12:00, midnight, will be towed to Lot 9.

Please see the map found on the ETSU Athletics website to view game day parking plans.

http://cdn.streamlinetechnologies.com/etsubucs/BD00A981-073E-4FA8-A72B-26969CB4FBB3/CampusFBPERMITParkingMap.pdf 

For more information, please visit ETSU Athletics website. Below is a link to their “Game Day Tips: ‘Things to Know’ for Sept. 2 opener”.

http://www.etsubucs.com/football/news/2017-18/14158/game-day-tips-things-to-know-for-sept-2-opener/ 

August 30, 2017

Please be advised, entrance to South Dossett Drive (from its intersection with Jack Vest Drive to its intersection with Beller Drive) will be closed at 4:00 p.m. on Friday, September 1. This section of South Dossett will close entirely at 5:00 p.m. on Friday, September 1. Please move vehicles from the area before it closes to avoid being towed. 

August 23, 2017

Please be advised...

Lot 17A will be closing at 5:00 p.m. Thursday, August 24, for special event parking. Vehicles need to be moved before 4:30 p.m. on Thursday, August 24.

The storm water contractor will be working on the west side of Campus Center building to complete the project. He will be working there from Thursday, August 24 through Sunday, August 27.

August 7, 2017

Please be advised that the storm water contractor is requesting the closure of Jack Vest Drive at the round-a-bout and David Collins Way so that a new stamped concrete sidewalk can be installed. The location would be the south bound lane from State of Franklin to David Collins Way (formerly known as North Dossett). The closure would last from Friday, August 11 through Sunday, August 13.

July 26, 2017

Please be advised...

Lot 10 will be closing at 8:00 p.m. today. This lot is being painted on July 27, 2017.

Lot 37 will be closed on July 27 and July 28 so that a contractor may prepare and repair the lot. 

July 25, 2017

Please be advised...

Lots 11 & 16 will be closing at 8:00 p.m. today. These lots are being painted on July 26, 2017.

Levels 1 & 2  of the Parking Garage will be closed July 31st and August 1st for pavement painting. Levels 3 & 4 may be accessed from the east side 2nd level entrance.

July 17, 2017 Storm Sewer Line Update

  • Parking Lot 37 will open by end of today for use. There will still be construction traffic in the area, so please use caution.
  • The next phase of construction will be on the south side of Campus Center Building. The storm line location is under the existing sidewalk.
  1. The sidewalk will be removed and replaced as part of the project.
  2. There will be tree pruning to accommodate the large excavator required to place the line (8 ft. deep).
  3. The south entrance at CCB will be temporarily closed.
  • To remove spoils and deliver gravel fill will require construction traffic on Pedestrian Mall.
  • Construction in this area should be completed over the next 10 days.

July 14, 2017

Please be advised that the contractor is moving forward at a fast pace and continues to push toward Gilbreath Hall. Next week they will finish excavation in Lot 37 and move into the area between Campus Center Building and Carter Hall. Be careful!!!

  • The main sidewalk on the south side of Campus Center Building will be removed as the storm line will be under it. This requires the use of a large excavator and large dump trucks used to haul away debris.
  • Trucks will be bringing gravel up Pedestrian Mall and dumping on the pavement. This is to fill in the trench containing the pipe. The contractor will work to minimize traffic and gravel on Pedestrian Mall.
  • There will be traffic barricades at Carter Hall for a few days as they move across the parking for Carter. Carter will still have parking, but it will be just a bit congested to move in and out of the lot.
  • Lot 37 will be open with gravel in place until paving can be completed. 
     

July 13, 2017

Please be advised that John Robert Bell Drive will be closed on Monday, July 17, 2017 for necessary crane work at the powerhouse facility.

June 28, 2017

Please be advised that South Dossett Drive will be closing between its intersection with Jack Vest Drive and its intersection with John Robert Bell Drive at 5:00 p.m. on Friday, June 30, 2017. This section of South Dossett Drive is going to be painted.

June 6, 2017

Please be advised that John Robert Bell Drive will need to be closed between its intersection with David Collins Way (formerly known as North Dossett Drive)and its intersection with South Dossett Drive from Sunday, July 2, 2017 through Wednesday, July 5, 2017. Construction crews will be replacing the Powerhouse Boiler. The parking spaces located between Carter Hall and Lamb Hall will be blocked off to allow two-way traffic into and out of Lot 37. Access to parking at the Mini-Dome/Bucsports, the front of Warf-Pickel and Lot 21 will remain available because David Collins Way will be open.

June 6, 2017

Please be advised that Jack Vest Drive from the roundabout (near the Parking Garage) to David Collins Way (formerly known as North Dossett Drive) will be closed from 7:00 a.m. to 5:00 p.m., Thursday, June 8, 2017 through Saturday, June 10, 2017. Construction crews will be working to improve storm water drainage across campus. Access to the Parking Garage will not be affected because the roundabout will still be open. Detour signs will be posted routing traffic to John Robert Bell Drive.

March 3, 2017

Please be advised that portions of Jack Vest Drive from Luntsford to the northwest corner of Lucille Clement will be closed Monday, March 6, 2017 through Sunday, March 12, 2017.  Construction crews will be in the area making sidewalk and ramp modifications.  One lane traffic will be maintained in this area.

November 8, 2016

Please be advised that there will be a traffic disruption at the new round-a-bout at the football stadium construction area November 19 - 26, 2016.  Vehicles will not be able to turn right onto Jack Vest Drive from South Dossett West at the traffic circle during this time.  Please use caution in this area.

November 1, 2016

Please be advised that Beller Drive, between Parking Lot 20 and Wilson-Wallis Hall, will be closed to traffic from
November 7 - November 9, 2016.  Please see map below for exact location.  No vehicle traffic will be allowed in this area during this time.  We appreciate your continued patience as crews work to finalize construction on the new Campus Data Center in this area.

August 15, 2016

We are pleased to announce the reopening of Jack Vest Drive to through traffic.  The southern portion of the road has been redesigned for safety, including a median and an enhanced traffic circle to better align traffic flows.  Please be alert and cautious due to the new traffic pattern.

July 22, 2016

Effective immediately, Jack Vest Drive between North Dossett Drive and Seehorn Drive will be closed.  Closure should last for approximately 2 weeks.  No vehicle traffic will be allowed in this area (please see map below).  As part of this closure, you will not be able to access or utilize Parking Lot 17 (behind Luntsford Hall) nor any CPA parking lots.

Jack Vest Closure Map

 


 Please be advised that lower Lot 38 in front of the CPA will be CLOSED all day on Tuesday, June 28, 2016.


 July 23, 2016

A portion of Jack Vest Drive running the western length of Lucille Clement Hall,
from the middle portion of Lot 38 in front of the CPA,
past South Dossett Drive up to Lot 17A beside the Physical Plant,
will close on June 4, 2016

No vehicle traffic will be permitted in this area during this closure.
Closure is necessary for the construction of a new traffic system in front of the football stadium.

 


 February 22, 2016

  • Lot 18 is now closed.

  • Lot 19 will be closed to parking beginning March 7, 2016.  All vehicles must be removed from this lot prior to March 7.   Any vehicles remaining in the lot after this date will be towed at the owners' expense.

  • Please be advised that Parking Lot 38 in front of the CPA is for use by patrons of the CPA only. Parking in these spaces is limited exclusively to the timeframe during which you are utilizing the CPA. Individuals observed parking in these spaces and walking elsewhere on campus other than into the CPA will be cited.

  • We would also like to remind you that street parking is no longer available on Jack Vest Drive along the west side perimeter of Lucille Clements Hall in front of the CPA. Vehicles parked in this area at any time will be cited. Please make sure that your vehicle is parked in an authorized space at all times with proper permit in place.

  • Lot 20 off Beller Drive, between Lyle and Earnest Houses, will be closed to parking beginning March 21, 2016.  Approximately 6 street parking spaces will also be closed and blocked to parking at the same time.  These spaces run along Beller Drive from the northwest paved area entrance at Wilson-Wallis Hall south to the entrance to Lot 20.  These closures are due to construction of the new ETSU Data Center project, which is expected to last one year. 

*Please be advised that Parking Lot 38 in front of the CPA is for use by patrons of the CPA only.  Parking in these spaces is limited exclusively to the timeframe during which you are utilizing the CPA.  Individuals observed parking in these spaces and walking elsewhere on campus other than into the CPA will be cited.

**We would also like to remind you that street parking is no longer available on Jack Vest Drive along the west side perimeter of Lucille Clements Hall in front of the CPA.  Vehicles parked in this area at any time will be cited.  Please make sure that your vehicle is parked in an authorized space at all times with proper permit displayed.


 

ETSU Students, Faculty, and Staff:

As of January 2016, we have entered Phase I of the construction process on the new football stadium.  This is an exciting time for our university; however, as with any construction, adjustments will be required.  We appreciate your patience and cooperation as we work to make this as seamless a process as possible.  In order to keep the entire ETSU community as well as campus visitors updated on campus construction, including parking and traffic changes, we are setting up a new informational website. 

Nancy Dishner Lane, which runs between the CPA and current parking lot 19, is now a two-way street and is no longer available for parking.  Some spaces in lot 19 have also been closed.  However, over 250 spaces are still available in lot 19 and will remain open until Phase II begins in March 2016.  During all phases of construction, ample spaces for student parking will remain available in lots 16, 21, and 22, which are all in the same general area.

Please continue to monitor the website for updated information on parking and traffic changes throughout the construction process.  Go Bucs!

 

2016-ETSU-Main-Campus-Parking-Lot-Closure-Map-1-11-16-(002)Click To Enlarge

Lot 18 and 19 closureClick To Enlarge

 

Lot 18 and 19 closureClick To Enlarge

 

 

icon for left menu icon for right menu